INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Auger Pressure Grouted Displacement Piles

Auger Pressure Grouted Displacement Piles

Auger Pressure Grouted Displacement Piles

(OP)
Does anyone have any information or experience with Auger Pressure Grouted Displacement Piles?

How do their installation and spacing requirements differ from traditional Auger-Cast-In-Place piles?

Thanks,

MLM

RE: Auger Pressure Grouted Displacement Piles

Hear is an article on the subject. I suggest you contact Go-con below.We probably also have a lot of information on file but we have not done any of this work recently.
Prepakt
 
1962 Norman Liver, working for Intrusion-Prepakt Co. in Cleveland, patented an auger-based soil mixing technique that has become the basis for the world’s current technology. Originally there was little acceptance in the United States and development was stagnant; but in the early 1970s and into the 1980s, the Japanese took the technology and made rapid advances. By the late 1980s,approximately 2,000,000 cubic meters of soil mixing and jet grouting were being performed annually in Japan, much of it in their coastal cities, ports and harbors (1995 DSM). Current Japanese practice utilizes soil mixing to transform soft clays into hardened, cemented barriers, water and contaminant cutoff walls and mass foundations for piers, wharves and building. Over 200 rigs work continuously in this $ 1.0 billion-plus per year industry in Japan. In comparison, the United States, with twice the population, has six rigs. President, Executive Vie-President and Assistant Project Manager, Geo-Con, Inc., -------------------------------------------------

Intrusion Prepakt
www.marineconcrete.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.