Force fit tubes vs welded tubes
Force fit tubes vs welded tubes
(OP)
Per ASME code, at what pressure do the tubes have to be welded connections? I don't have a copy of the code available. I am trying to understand why there is a discrepency with a vendor.
Thanks.
Thanks.





RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
1. Expanded and beaded
2. Expanded, beaded and seal welded
3. Expanded and seal welded
4. Welded
The welded in 4) uses partial penetration groove welds that provide the necessary pull out strength versus expanded and seal welded.
All four methods of attachment are not related to pressure. They are options for the designer to consider. I would obtain a copy of PFT and review it especially if you are in the position of evaluating design options of vendors.
RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
You say firetube in your second post but refer to the steam drum in the third. You could fall under PWT-11 or PFT-12.
There may be a case of driven ferrules or simple tube expansion. The tubes may be over expanded or not expanded enough. You may have tubehole cracks. The tubes may have been dirty when they were expanded.
My suggestion would be to have a good "R" stamp repair firm to have a look at this for another opinion.
Seal welding is not the answer for leaky tubes. You have other problems.
RE: Force fit tubes vs welded tubes
If this boiler is only 3-4 months old and you already have persistent tube/tubesheet leaks from cycling this is a significant problem.
If this is a warranty issue being only 3-4 months old, and the vendor is proposing seal welding you better sit down and confront them as to why they intend to seal weld. Were the tubes over-expanded into the drum? How were the tubes expanded into the drum?
The reason for my asking these questions is to show how detailed you need to be. If you have an inspection agency that insures the boiler for your company or your Jurisdiction provides this service, you might want to hire a Boiler Inspector to review your problem with you so that you can gain some OTJ experience (in a hurry).
RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
For small package tube boiler there generally have rolled connections - WITH NO SEAL WELDING. Tubes are rolled between 8%-10% wall reduction - basically strain. You can go higher without problems. I have seen tubes rolled to 34% that have been in service for 10 years, although I would not recommend going over 15% - it all depends on the final hardness of the rolled material - I believe NACE has guidlens for max hardess to avoid SCC.
Remember the words seal weld imply just that - it is a seal not a strength weld. The tube is held into the tube sheet by the mechanical rolling process. If the tubes are seal welded, the welds will likely fail from fatigue. Another thing to look at is the tubes on the OD of the drum - it is common for tube failures to occur there with boiler that are cycled.
Cheers.
RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
RE: Force fit tubes vs welded tubes
citric acid, not acidic acid. Duh.