INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME SECTION I - PWHT (SR)

ASME SECTION I - PWHT (SR)

ASME SECTION I - PWHT (SR)

(OP)
HI,
I WANT TO KNOW THAT, IS THERE PWHT (SR) REQUIRE FOR 3" WELD NECK FLANGE WELDED ON 8" STD.SA-53B PIPE (DOWN COMER OF BOILER)?
I NEED HELP ASAP....
MIHIR5577


RE: ASME SECTION I - PWHT (SR)

mihir5577;
Per ASME Boiler and Pressure Vessel Code, 2004 Edition, Section I, Table PW-39 post weld heat treatment for P-No 1 base material would be required for circumferential butt welds where the nominal wall thickness is greater than 3/4". Be careful, the nominal wall thickness used for determination of PWHT is the wall thickness at the weld prep of the welding neck flange, not the thickness of the flange.

RE: ASME SECTION I - PWHT (SR)

Ah....After further review, this circumferential butt weld joint would appear to fall under ASME B31.1 Power Piping in lieu of Section I. The PWHT wall thickness recommendation still stands for P-No 1 material, however, your reference is ASME B31.1, 2004 Edition, Table 132.
 

RE: ASME SECTION I - PWHT (SR)

(OP)
HI,
THANKS FOR REPLY...BUT I WANT TO KNOW THAT I'LL HAVE TO WELD FLANGE ON DOWNCOMER, BUT FIRST WNRF FLANGE WILL BE WELD ON 3" STD. PIPE (3" LG.) BY CICUMFERENTIAL BUTT WELD AND THAN THIS 3" STD. PIPE WILL BE WELD TO 8" STAD.-SA53B PIPE THROUGH FILLET WELD - FULL PENETRATION WELD.
SO NOW PWHT REQUIRE ON THAT PORTION WHERE 3" PIPE WELD TO 8" STD. PIPE?
AS PER SECTION - PW-39-(h) SHOWS THAT FILLET WELD AND CUT HOLE MORE THAN 2", REQUIRE PWHT.
PLS..LET ME KNOW...
THANKS
MIHIR5577

RE: ASME SECTION I - PWHT (SR)

Confusing post, but I believe what you are describing is a 3" flanged pipe branch that will be full penetration welded to an 8" pipe run (the boiler downcomer), correct?

Regardless, the code of construction is still ASME B31.1, not Section I (PW-39). You need to be sure that you have adequate reinforcement for this branch connection – see B31.1, Paragraph 104.3.1. The PWHT requirements in Table 132 still apply for the butt weld joining the 3" branch to the 8" downcomer.

RE: ASME SECTION I - PWHT (SR)

(OP)
Hi,
Thanks for quick reply.
Thanks
Mihir5577

RE: ASME SECTION I - PWHT (SR)

(OP)
Hi,
Now i want to know that is there PWHT require if i will weld
3" std. SA-53B PIPE TO 8" STD. SA-53 B PIPE BY BRANCH CONNECTION?
IF YES, AS PER WHICH PARA OF WHICH SECTION?
I NEED HELP ASAP....
THANKS
MIHIR5577

RE: ASME SECTION I - PWHT (SR)

ASME B31.1, Power Piping, Table 132.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources