INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

preheating for interpass for welding

preheating for interpass for welding

preheating for interpass for welding

(OP)
hello,
we did the first pass of vertical weld in storage tank but becuase of raining we stoped the work.after 2 days we started to weld the socand pass without any preheatig and the ambiente temprature was 5-10'C .our refrence standard is API650.for second pass the plates was dry.
can this sequence cuase a problem in our work and is it against the standard.

RE: preheating for interpass for welding

How thickj was the shell plate?

Steve Braune
Tank Industry Consultants
www.tankindustry.com

RE: preheating for interpass for welding

What preheat does the WPS require and is 5 to 10 deg C within the allowable temperature variation from that qualified without having to resort to requalification?

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

RE: preheating for interpass for welding

(OP)
thank you for your response,the shell thk.20 mm and the preheatig temp is 30

RE: preheating for interpass for welding

afshin, I am assuming that the following post you made elsewhere also belongs herein...

You state... "addition for former questions our standard is API650 and shell thk. in first shell is 20mm and preheat temp. which is mention in WPS 30'c"

API-650 requires that welding be done above 0 degrees C; otherwise, preheat is required.  Also, there are additional preheat requirements for plates above 32mm.

Since welding was done above 0 degrees C and the plate is only 20mm thick, I do not believe that you have a problem with API-650.

Notwithstanding this minimum requirement for preheat, the welding is to be performed following a WPS that meets the API minimum requirements.  It sounds like the only problem you have is the the contractor did not follow his own WPS.

Hope this helps.

Steve Braune
Tank Industry Consultants
www.tankindustry.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources