INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PEMB spread footings
2

PEMB spread footings

PEMB spread footings

(OP)
I'm working on the foundation design for a 130' span PEMB with 30' bay spacings.  Allowable Bearing Capacity = 4 KSF.  At column line A the columns are 4' above finished grade and at column line B the columns are 13' above finished grade.  Bottom of footings are 5' below grade.  The max. "thrust" force for such a building is 68 kips, which I received from a PEMB builder.  There is an interior retaining wall 14' from column line B, which forms a trailer bay.  I want to design the footings to resist the moment but the moment is so great at column line B that my footing is becoming too large.  I have thought about a tie beam at the base of the footing to the retaining wall and also about using a combined footing.  The combined footing also seems to turn out to be rather large.  

I would appreciate any tips on how to go about reducing the footing size I currently have.  

RE: PEMB spread footings

Ma'af - what is PEMB?  Not run into this term before.

RE: PEMB spread footings

PEMB = pre-engineered metal building

RE: PEMB spread footings

If I understand you correctly, you have pinned PEMB column bases supported above adjacent grade by a concrete column or wall, which would be fixed at its base.  The horizontal thrust * the 13' above grade is the moment you are having to resist, right?

I think the tie beam is the best solution.  Are drilled piers an option?  If so, you might could design it as more of an embedded pole-type foundation.

RE: PEMB spread footings

Taro - thanks; otherwise I would have SWAGged it.

RE: PEMB spread footings

Our firm just finished a church project with a similar condition to what you are describing--and what a hassle!!!  Is there any way you can talk the preengineered metal building manufacturer into extending his columns at Grid Line B down to grade?
If not, the tie beam is obviously the best answer, but can you span it across the trailer bay?  Is there a headroom issue?  Or an interference issue?

DaveAtkins

RE: PEMB spread footings

Be aware that PEMB's are typically designed assuming that the foundations do not deflect. A pier supporting a PEMB column may have significant deflection that will have a weakening affect on the steel frame.

I like DaveAtkins suggestion.

RE: PEMB spread footings

(OP)
Thanks for the responses.  

Drilled piers are not an option here.  I'm going to talk with the PEMB manufacturer to see if the column can be extended down to grade.  If this is not a possibility than I will go with the tie beam.  Unfortunately, there are headroom issues in the trailer bay so I will have to keep the tie beam at the footing level.  I will also have to talk with the PEMB manufacturer about allowable deflections in the pier supporting the column.  

I'll post the answers I get.  Thanks again!

RE: PEMB spread footings

A tie beam at the footing level won't do much good.  If you can't make the preengineered metal building manufacturer change his design, and you can't have a tie beam across the trailer bay, then you will need to design a large pier with a large rectangular footing to resist the loads.  Or perhaps the entire wall along Grid Line B can have a retaining wall-like footing under it.

DaveAtkins

RE: PEMB spread footings

srbu,

We recently designed the foundations for a PEMB where the client wanted a dirt floor w/o tie beams.  Fortunately there was was an inner wall parallel to the foundation.  We tied the two together, using the conbined weight and soil between to resist sliding and overturning.  The span was a little greater than yours but we were nearly at grade.  Can you tie to the truck bay walls and extend them a little deeper to get the resistance that you need?  If not I would look at drooping tie beams under the truck bay.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources