INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

question about footings

question about footings

question about footings

(OP)
The actual design footings for a three floor building calls for 2ft deep footing with reinforcement at 1 ft -10" from top.

The bearing rock is about 6ft from required elevation. the contractor wants to fill the footing pit with 6ft of concrete(4000psi) with the reinforcement provided at 1ft-10in from top. Is this an acceptable practice?

RE: question about footings

Your contractor is right.  I will do exactly the same.  4000 psi plain concrete behaves just like bedrock after cure.  I have no problem with it.

RE: question about footings

Agreed.

RE: question about footings

With 6 feet of concrete, you may need to consider this "mass concrete".  Additional reinforcing or other measures may be needed to deal with the heat of hydration and other effects.

RE: question about footings

I make them pour it in 2 phases. First phase is to pour the concrete to bring to bottom of footing grade. Then after concrete set for 7 days, the footing may be formed and poured. A cold joint is needed between the 'mass' concrete and the actual footing.

RE: question about footings

Concur with dmoler. This is exactly how seal concrete / footings in cofferdams are constructed for bridge and other heavily loaded foundations.

www.SlideRuleEra.net

RE: question about footings

Your concrete doesn't need to be "maximum" strength.  It can be of a low strength variety - a cement stabilized base course if you so wish.  You certainly don't need reinforcement - it is, in effect, just a stronger variation of engineered fill - and why don't you just use a DOT standard base course material rather than concrete? Properly placed and compacted, it would be more than capable of supporting a 3 storey building.

RE: question about footings

I see this situation often.  I agree with dmoler and BigH - first pour to reestablish the proposed bearing elevation with 1,500 psi concrete 'flowable fill' and a second pour for the actual foundation as previosly deigned and reinforced.  Place concrete 5 to 7 days apart.  Contractors usually fine working with aggregate in excavations greater than 4 to 5 feet deep difficult and time consuming.  Flowable fill is quick.  1,500 psi concrete has adequate strength and is more economical than 4,000 psi concrete.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources