INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Foundations

Foundations

Foundations

(OP)
I have a 4 storey steel structure used in a mining environment. When sizing the footings for the 12 columns the footings run into one another. How do I design a raft foundation incorporating all the concentrated loads from the columns?

RE: Foundations

Why not use a grillage raft - basically strip foundations connnecting the columns - you may be able to cut down on the volume of concrete.  See Tomlinson's foundation book for some ideas.  If you design a solid raft, you can thicken the raft at the column locations.  Again, Tomlinson explains this pretty well along with good sketches.

RE: Foundations

I'm not familiar with mining but assuming all the usual principles apply - Use FE software, modelling the ground using a uniaxial spring constant. Apply all of your reaction forces in appropriate combinations and see what you get. It's always good advice to vary the spring constant to both higher and lower values. In the absence of geotechnical input I tend to do three runs - firstly my best guess spring value, then both half and double the spring value. If my element stresses vary significantly then the foundation is sensitive to ground conditions and requires further thought, if not I take the envelope condition from the three runs, check ground settlement based on the maximum pressure and proceed to detail the reinforcement.

The geotechnical folks are now screaming and tearing their hair out... In my defence this is genuinely what we do. If and when there is suitable geotechnical input we may fine tune the process a little!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources