INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

two times pwht

two times pwht

two times pwht

(OP)
is it accepted by ASME SecVIII to repair many of the nozzle welds of a pressure vessel after pwht and then apply pwht for the whole component, in furnace?

RE: two times pwht

Yes, as long as your WPQR's have been qualified with a maximum PWHT cycle time.

RE: two times pwht

Per Section IX for subcritical PWHT of the subject welds, time at temperature is only an essential variable when impact testing is required.  Per ASME Section VIII, Div.1 UCS-85(c)requires the material test report reflect at least 80% of the total time at PWHT temperature unless exempted per UCS-85(e, (f), (g), (h), and (i).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources