×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Culvert replacement-tidal region

Culvert replacement-tidal region

Culvert replacement-tidal region

(OP)
What can anyone tell me about design criteria for culvert replacement when the flow is tidal?  The PM says we don't need a HEC RAS run for water surface elevations, but I need velocities to give to another department for scour calculations.  Also, I need to reset/resize these culverts to aleviate flooding over a roadway.  I am not sure what I'm governed by.  Can anyone help?

RE: Culvert replacement-tidal region

You need to find your Q. then design the pipes to take it all with V>/+ 2.5fps.  Don't use a pipe that reacts with the saltwater.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: Culvert replacement-tidal region

(OP)
So I find my flows using HEC HMS as if the area were not tidal and then how do I account for the tidal changes?  Aren't those changes area-specific?  Don't I need high and low tide info for the project site?  Once I find that, how do I use that data to account for the tidal flow changes?

RE: Culvert replacement-tidal region

You need to design for your worst-case.  This involves checking your boundary conditions:  high tide and low tide.  You need to make sure that your flow can pass through the culvert without flooding at high tide, but you may get a higher flow rate at low tide when you have a lower tailwater elevation.

The PM may be right that you don't need a HEC-RAS, but you will need some kind of modeling.  Ask your PM what he/she suggests.  If they say you can do these calculations in your head, use whatever software you're most comfortable with.

You should be able to account for the tides with tailwater elevation set to the high/low tide mark.  I'm not sure how this would affect your flow rate/velocity upstream of the culvert, however, and you may indeed want to use HEC-RAS with ineffective flow areas specified below the high/low water elevation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources