INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Field Instruments on PV and Piping?

Field Instruments on PV and Piping?

Field Instruments on PV and Piping?

(OP)
Dear All

Field Instruments such as Thermowell, Level Gauges, Transmitters etc that are mounted on Pressure vessel and Piping are found to contain Welding and on some instruments we find reservoirs.

Which Code governs from the point of view of Welding and NDE and Pressure testing requirements for the field instruments? Are there ANSI guidelines for the same, Does ASME Specify any specific requirement for field instruments.

RE: Field Instruments on PV and Piping?

If the attachments, which I call appurtances, are directly welded to the vessel AFTER the pressure vessel has been in service, either API or the National Board Inspection Code (NBIC) would govern in terms of welding requirements. The actual Code depends on your Jurisdiction regulations where the vessel is installed. If this is a new vessel, the Code of Construction rules must be followed.

For either in-service or a new vessel, the Code of Construction rules must be followed for any material and weld detail for direct attachment of the appurtances to the vessel pressure boundary.

RE: Field Instruments on PV and Piping?

(OP)
The attachments are flanged and Bolted construction.

When i have to procure these field instruments, i need to specify the NDE requirements and Welding requirements.

RE: Field Instruments on PV and Piping?

Different installation requirements may apply.  Different codes apply to different industries.  Is this for a section I or section VIII vessel, onshore, offshore, etc.?  Are the instruments mounted on the vessel or on a bridle?

I would require hydrostatic testing.  With hydrocarbon products and other high pressure applications I prefer magnetic level indication and assorted technologies in lieu of level gauge glasses.  If using gauge glasses offshore they require a protective shield.

John

RE: Field Instruments on PV and Piping?

If the connection of the instrument to the vessel is flgd or thrd there is not Code of construction for the instrument if it is under the size specifically in the Code (ASME Sect VIII-1 or piping constructuion)
in ASME VIII-1 non.Code vessel can be 6 in or less welded or not.
The instrument has to be meet/certified to ANSI stds.

genb

RE: Field Instruments on PV and Piping?

If the instruments have bolted (flanged) or screwed connections to the vessel then the applicable piping code applies such as B31.3.

Instruments like level gauges usually are not required to be hydrostatically tested as they fall under the category that a protype has been tested to failure so the specific item is not required nor desirable to be field tested.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources