INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

WPS Review

WPS Review

WPS Review

(OP)
When reviewing a WPS submittal that is based on qualification testing per D1.1, D1.1 or D1.4, is it common practice to also review the supporting PQR?

RE: WPS Review

I always do.  I won't accept the WPS unless I've also approved the PQR.

Hg

Eng-Tips policies:  FAQ731-376

RE: WPS Review

(OP)
Thanks for the response HgTX. I had been trying to convince a collegue of mine to do so but to no avail. I got him to read your response to this question and now he is having second thoughts.

I take the same approach when reviewing a concrete mix design on materials I am not familiar with and have no data on..just got to see the test results etc used for establishing a standard deviation or three point W/C ratio vs strength curve.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources