INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Is there a Standard for "No. 2 Crusher Run"

Is there a Standard for "No. 2 Crusher Run"

Is there a Standard for "No. 2 Crusher Run"

(OP)
I'm working on a job here and for the foundation of our basin we have specified "95% compacted No. 2 Crusher Run"

The customers QC department has come back and want some kind of spec. or ASTM # that actually specifies WHAT No. 2 Crusher Run is...what standards it has to meet to actually be No. 2 crusher run.

Does anyone know of a standard or spec. that would define what they want to know?

Thanks a lot
Ken

RE: Is there a Standard for "No. 2 Crusher Run"

Your state DOT might have a spec that you can refer to.  Try asking this question in one of the geotechnical engineering forums, they can probably have a reference.
regarding your compaction, do you define what you mean when you say 95% compacted....?  You can compact according to the modified proctor test or the standard proctor test, but they are not the same thing.

RE: Is there a Standard for "No. 2 Crusher Run"

it's a sad day when we don't know what our own specifications mean ... and logically, why we specify them

RE: Is there a Standard for "No. 2 Crusher Run"

I have 10 years experience as a structural engineer and know several older engineers and contractors who refer to "crusher run" alot for use under slabs-on-grade.  when asked what that means, they typically don't have a definitive answer as far as gradation.  except to say it's 3/8" and smaller gravel with lots of fines.  Apparently that was a very common term decades ago that never went away.  I spec "unwashed size no. 10 per ASTM D448", which is referenced in ACI 302, section 4.1.4.

RE: Is there a Standard for "No. 2 Crusher Run"

I also recommend you check your State's DOT specs for subbase under roadways.  Here in Wisconsin, DOT Gradation #2 is an excellent granular fill for use under slabs, footings, etc.  It is similar to what archeng59 described--gravel with lots of fines.  The fines help with compaction.

DaveAtkins

RE: Is there a Standard for "No. 2 Crusher Run"

No.2 crusher run refers to #2 crushed stone with all of the stone dust froom crushing.  #2 crushed stone is just the stone. In NY the state DOT has a spec for it, where it is also refered to as a Type 2 subbase.  When we specify it we refer to the NYSDOT specifications.  

Recommending compaction effort and fill material is the specialty of geotechnical engineers, but structural engineers usually have a working knowledge of it too.  Is there a geotechnical engineer that is involved with your project? I didn't think that aerospace engineers normally get involved with things like crusher rune stone.

RE: Is there a Standard for "No. 2 Crusher Run"

(OP)
Thanks guys,bjb has pretty much hit on the head what I thought.  I didn't know for sure if there was anything else on this.  I DO have the spec. from the NYSDOT and what you say makes good sence.  You're right I don't usually deal with this stuff lol.  I'm also a Mechanical Engineer and this is some large scale heat transfer equipment I'm working on.  The foundation design (based off my loadings) was outsourced by us to a small local structual company.  I could not seem to get an answer from them ( at least a timely one) and figured it couldn't hurt to try here.

Thanks again

RE: Is there a Standard for "No. 2 Crusher Run"

aeroUB, are you in NY, and does the UB in your name stand for University at Buffalo?

RE: Is there a Standard for "No. 2 Crusher Run"

(OP)
yes and yes.  In fact, one of my best friends is a stuctural Engineer from UB (few years ago).  I went for Aero and Mech.

RE: Is there a Standard for "No. 2 Crusher Run"

small world, I went to UB too, I moved out of the Buffalo area in early 2002 and now live near saratoga. Imight be familiar with the consulting structural that was involved with your project, but don't name any names.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.