INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Light weight streinth

Light weight streinth

Light weight streinth

(OP)
We usually let concrete floors we produce sit for 21 days. (until the 21 day break test comes in ) We want to start construction on the floors 7 days after the pour is there any codes that permit this. I have heard that if the 7 day test is returned at 75% then there shouldn't be a problem, We are using light weight with a 3000 PSI

RE: Light weight streinth

This isn't a code issue at all.  It is simply your own judgement as an engineer as to what concrete strength is "enough" to allow formwork to be removed, workers to get on top of the concrete, etc.

You should look at the anticipated temporary construction loads on the concrete and perhaps analyze the framing with a reduced f'c to see what level you need.

Usually, f'c doesn't affect flexure all that much, but shear and compression are more sensitive.

We usually require 75% of f'c as a minimum.  Have the contractor make additional cylinders (if its not too late) so you can test at 5, 7, etc. days.

RE: Light weight streinth

I haven't spent time looking it up to see what the exact wording is, but ACI 301 has a statement about not applying construction loads that will damage a concrete member.  there is similar verbiage in other ACI documents.  typically, the gist is that the contractor can work on a slab as long as the concrete is hard enough to not be damaged and has adequate strength to support the loads.  If there isn't adequate strength, then shoring/reshoring is needed for temporary support.  for slabs-on-grade, I recommend that the contractor wait 7 days, which is the curing time.  usually after 7 days of adequate curing at appropriate temperatures above 40 degrees, the concrete should be a 75% of the 28 day compressive strength.  hopefully this helps.

RE: Light weight streinth

Are the cylinders going to be field cured?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources