Hydraulics - side weirs as flow distribution in a channel
Hydraulics - side weirs as flow distribution in a channel
(OP)
I am trying to calculate how flow will be split over 4 side weirs coming off a common channel. The channel is a feeder channel to 4 identical process tanks (stopping just after the last weir), and the aim is to design the system such that as equal a flow split as possible is achieved between the 4 tanks fed from it.
I am trying to convince someone that, although there may be some variation in discharges over the 4 weirs, it can be kept to a minimum by selecting the correct channel cross section and weir heights, thereby eliminating the need for a distribution chamber. I'm hoping to keep the weir heights equal if possible.
I'm at the edge of my hydraulic knowledge with this one, so I'd appreciate any advice on whether I'm correct in my assumption, and how I can prove it.
I am trying to convince someone that, although there may be some variation in discharges over the 4 weirs, it can be kept to a minimum by selecting the correct channel cross section and weir heights, thereby eliminating the need for a distribution chamber. I'm hoping to keep the weir heights equal if possible.
I'm at the edge of my hydraulic knowledge with this one, so I'd appreciate any advice on whether I'm correct in my assumption, and how I can prove it.





RE: Hydraulics - side weirs as flow distribution in a channel
One thing you might consider instead is having the four weirs cut by a laser or a waterjet under CNC control, so that they are all equal. Do not allow anyone to deburr or radius their edges, of course.
You might even put a bridge over the top of the weir proper, with a row of tapered needles of different lengths projecting down toward the design flow level. It's no trick to put all those features in the weir plate, so no adjustment is possible, and they'll all be the same, etc. Then anyone can tell at a glance if the weirs are balanced, just by counting the number of needles breaking the flow surface. If your liquid is free of flotsam and foam, that should provide continuous verification that the flows are balanced.
It doesn't provide a means for actually balancing the flows. One way to do that is to put vertical slots in the weir plates for the mounting bolts, so that you can slide the plates up and down at startup to balance the flows.
You will still need a barrel and a watch to convince the hardheads.
Mike Halloran
Pembroke Pines, FL, USA
RE: Hydraulics - side weirs as flow distribution in a channel
A better solution would be to come to the end of the channel, go under a velocity dissipating baffle wall and then have the flow go upward over the 4 weirs. This may be what you are referring to as a distribution chamber.
RE: Hydraulics - side weirs as flow distribution in a channel
Braxton V. Lewis
RE: Hydraulics - side weirs as flow distribution in a channel
Keep the channel wide enough to ensure there isn't a high velocity and the head loss between the first and last weirs is of the order of a few mm and the difference in flow over the first and last weirs will be negligible. Use adjustable weir plates as Mike suggested to make up for any variations introduced when constructing the channel.
RE: Hydraulics - side weirs as flow distribution in a channel
If you need a precise split, you'll need to try what bimr suggests above.
RE: Hydraulics - side weirs as flow distribution in a channel
If you have a velocity of any kind in the chamber your backwater profile will vary with distance, which will vary the head over each weir and consequently the discharge.
Couple of potential problems, depending where you are in the process, silting up and solids deposition may be an issue. And you do require a reasonable hydraulic gradient.
A useful document on side weirs is 'Hydraulic Design of Side Weirs' By RWP May, BC Bromwich, and CE Rickard
RE: Hydraulics - side weirs as flow distribution in a channel
RE: Hydraulics - side weirs as flow distribution in a channel
In order to avoid settlement of solids I need to keep the velocity above 0.4m/s.
I ran a computer simulation of the problem, and discovered what most of you had said - it works great for really low velocities, but to avoid settlement I had to vary the weir heights. This worked for one flow, but the split was out by about 10% at low flows.
I have alleviated this slightly by gradually narrowing the approach channel to increase the velocity and depth. I have also decided that adjusting lots of weirs is pretty tricky, so to control the head in the channel in a more user friendly way, I am putting sluice gates in to provide orifices of varying sizes coming off the channel, before the weirs. The weirs will all be at the same height. I think that a simple level indicator such as a gauge board or ultrasonic head in the channel could be used to verify the depth variance and hence accuracy of flow split along the approach channel.
I found JedClampett's point about the piling up at the far end, and although I can't model this, hopefully fine adjustment of the sluice gates will help.
Needs further work, but judging from the model it seems to have some potential (achieving splits with a 2-3% variance at low flows), however I need to ascertain what tolerances the plant will accept.
I confess that I am leaning further toward the separate splitting chamber solution, but am going to discuss the above solution with the plant manufacturers.
RE: Hydraulics - side weirs as flow distribution in a channel
Mike Halloran
Pembroke Pines, FL, USA