INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ACI 332 - Discontinuous Footings?

ACI 332 - Discontinuous Footings?

ACI 332 - Discontinuous Footings?

(OP)
Our company does alot of "walk out" foundations.  The footings are stepped by 4' so that we can pour the foundation as a continuous wall at with wall heights of 12' and 8'.  The question is wheter or not the footing needs to be continuous at the elevation change.  I know that most people will logically say that it should be.  If the foundation is formed as two separate footers with minimum space between them at the vertical elevation change does this violate code?  Does the additional cost, labor, and concrete add anything to the load bearing of the wall?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources