INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PQR according to ASME Code sec. IX

PQR according to ASME Code sec. IX

PQR according to ASME Code sec. IX

(OP)
Good morning and excuse me for my English
the question is:
I need to qualify (in accordance with ASME code sec IX) the welding procedure of a pipe A333 Gr6 with a pipe A335 P11 (Cr-Mo-Si).
The job temperature is -15°C. I shall do Impact test in Weld Metal - Base Metal  - HZA, to -20°C.
It is necessary to do Impact test on Base metal on pipe A335 P11? The pipe material certificate is tested at +20°C.

Many thanks
Regards
jean71

RE: PQR according to ASME Code sec. IX

jean71,
What Code section are you fabricating to?  Based on the information supplied, impact testing would be required for the P11 pipe at -15C.
Regards,
RLS

RE: PQR according to ASME Code sec. IX

(OP)
lostsailor,
the Code is ASME and PED 97/23 CE.

jean71

RE: PQR according to ASME Code sec. IX

The Engineering defined minimum design metal temperature governs impact test qualification of the welding procedure in accordance with the Design Code requirements. If the design Code were ASME B31.1, impact test qualifiation would not be required.  If the design Code were ASME B31.3 or ASME Section VIII, you would need to impact test qualify the P11 HAZ as well.  It would appear that you did not purchase the P11 alloy pipe for procedure qualification with demonstrated impact toughness at the minimum design temperature conditions; you will be lucky to meet the impact requirements for procedure qualification at -15 C.  

RE: PQR according to ASME Code sec. IX

(OP)
Stanweld,
many thanks for your reply.
The design code is ASME sec. VIII and I shall do impact test on pipe P11 at -20C (so I increase the range) in HAZ and Weld metal.
Can I omit impact test on base metal P11? Or I have to test it at different temperature (for example +20C)?

Thanks again
jean71

RE: PQR according to ASME Code sec. IX

The requirements of UG-84 and UCS-66 apply to the base material as well the welding procedure. SA-335 P11 fits into Curve A of FIG. UCS-66 per note (a)(1). The pipe must be impact tested at the -15 C MDMT.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources