INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Joint factor

Joint factor

Joint factor

(OP)
Can A312 welded pipe be upgraded to a 1 joint factor with 100% radiography?

RE: Joint factor

Yes, provided a full penetration seam weld is used. For piping this would be a single-vee or double-vee weld joint configuration. The requirement is full penetration coupled with 100% RT.

RE: Joint factor

Didn’t finish my above post;

One additional comment pertaining to the SA 312 Specification - the requirements of this specification indicate that seam welds shall be made with no filler metal (autogenous) for seam welded or HCW seam welded piping. Again, the same concept applies for electric fusion welded pipe with no filler metal (see ASME B31.1, Table 102.4.3) provided 100%RT is performed.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources