Custom Tasks in Task Scheduler
Custom Tasks in Task Scheduler
(OP)
Hello All,
I was wondering if it is possible to create a custom task within task scheduler to take all the latest revisions of drawings that are in the PDM works vault and generate a PDF of each drawing. It would even be a bonus to have the PDF be attached to the drawing. If this is possible where do I start? I am not very familiar with the task scheduler.
I was wondering if it is possible to create a custom task within task scheduler to take all the latest revisions of drawings that are in the PDM works vault and generate a PDF of each drawing. It would even be a bonus to have the PDF be attached to the drawing. If this is possible where do I start? I am not very familiar with the task scheduler.
Best Regards,
Jon
Challenges are what makes life interesting; overcoming them is what makes life meaningful.
Solidworks 2006 SP0.0






RE: Custom Tasks in Task Scheduler
I'm not at my station to give further details, but I know that exists there.
Regards,
Scott Baugh, CSWP
www.scottjbaugh.com
FAQ731-376
RE: Custom Tasks in Task Scheduler
I hope it runs better in 2006.
Chris
Sr. Mechanical Designer, CAD
SolidWorks 05 SP3.1 / PDMWorks 05
ctopher's home site (updated 06-21-05)
FAQ559-1100
FAQ559-716