INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Settling, without compaction

Settling, without compaction

Settling, without compaction

(OP)
I want to convert a sediment trap into a rain garden.  I need to fill in 0.8 feet; 0.4 with sand, then 0.4' with topsoil.  I don't care whether the sand and soil are mixed.

It can't be mechanically compacted, but to be landscaped and allowed to settle to a final depth.

How deep should each layer be placed to settle to a total of 0.8'?

A reference would also be appreciated (I'm not a geotech, but I have access to soem common texts).

Remember: The Chinese ideogram for “crisis” is comprised of the characters for “danger” and “opportunity.”
-Steve

RE: Settling, without compaction

I think you are being overly concerned on the settlement of a surficial layer that is less than 1 foot deep, that is of nonstructiral use.

I would assume that if the area is large enough that the material would be placed using a dozer.  Itf the material is placed with LGP equipment you should not see excessive compaction of the material at the time of placement.  Also, the equipment should provide sufficiant compaction (in the range of 85-90% of a standard proctor) to limit excessive settlment. The materials should be close to the optimum moisture at the time of placement.

Since you are looking for 0.4' (~5-inch) layers, and I would assume you have some tollerance (slightly thicker), I would have the contractor place the material with no additional compaction to 5 to 6-inch lifts. A full 1' would allow for up to 20% settlment, which I doubt you would exceed if the materials are placed as noted above.

The only reference I can provide is my many years of fill observation and testing.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources