I have a question. I am leaving my current job and moving on to better things (I believe). One of the concepts I tried to implement in my current job (and something that my boss wanted) was a lean manufacturing concept on our production department.
The problem I was running into was we don't plan anything, I could not control inventory and clean up areas, and there was a general sense of not wanting to change (among other things). I expressed these concerns to my boss and he told me that this company will NEVER plan and to move on, they will NEVER let me get rid of product and inventory that is not needed so move on and it is my job to convince everyone from management down to the floor people that change is needed (without showing numbers).
Like I mentioned before, I am now moving on and I have suggested to this company that they do not need to hire another engineer until they are ready to make some changes. My boss told me that they do not need to make these changes to be "lean and productive".
My question really is how would you feel about that? Would you want to be the only engineer for a company with that policy?
The problem I was running into was we don't plan anything, I could not control inventory and clean up areas, and there was a general sense of not wanting to change (among other things). I expressed these concerns to my boss and he told me that this company will NEVER plan and to move on, they will NEVER let me get rid of product and inventory that is not needed so move on and it is my job to convince everyone from management down to the floor people that change is needed (without showing numbers).
Like I mentioned before, I am now moving on and I have suggested to this company that they do not need to hire another engineer until they are ready to make some changes. My boss told me that they do not need to make these changes to be "lean and productive".
My question really is how would you feel about that? Would you want to be the only engineer for a company with that policy?





RE: Lean Manufacturing - Without proper planning
I did, however, interview with a company that was really on track with lean manufacturing. No underutilized space, machinery, or people. It was like an ant colony watching these people work. The CEO admitted to me that it would not be possible if they had not gotten lean cooperation from their suppliers as well as their customers. Some people think "lean" means fewer people. But this company was ALL people, few machines. And they were lean. Raw material. Product residence time in a warehouse was less than 24 hours. It was impressive. (but they also offered peanuts, so I had to turn that job down too.)
ChemE, M.E. EIT
"The only constant in life is change." -Bruce Lee
RE: Lean Manufacturing - Without proper planning
That is one of the reasons I did not last long here.
I am told they are going to look for another engineer to move them to lean and will not look for them to change. I have told them it will not work. Am I crazy?
RE: Lean Manufacturing - Without proper planning
ChemE, M.E. EIT
"The only constant in life is change." -Bruce Lee
RE: Lean Manufacturing - Without proper planning
RE: Lean Manufacturing - Without proper planning
We had a situation here where we implemented lean manufacturing for some hydraulic cylinders. We had done a bunch of studies to determine how many carts we needed and how many cylinders each cart would need to hold. The system was working great for about 6 months, then we got a new VP of Operations. He wanted to increase production, and thought by changing the carts to make them hold 50% more cylinders would do the trick. Now everytime I walk through the manufacturing floor, all I see are loads of compleated cylinders, stacked on shelves.
"I think there is a world market for maybe five computers."
Thomas Watson, chairman of IBM, 1943.
Have you read FAQ731-376 to make the best use of Eng-Tips Forums?
RE: Lean Manufacturing - Without proper planning
RE: Lean Manufacturing - Without proper planning
"If you don't have a plan, you have a plan to fail" (unknown).
You did well to move on to a different employer. Like others here, I turned down offers from companies that despite what they said, were unwilling to support improvements in their operations. Aspearin1 reminded me of one prospective employer that stated with pride that their inventory accuracy had increased to 20%! There also was stuff all over the place and you could not tell which parts were good and which weren't. While you might feel that you could do no wrong if you took such a job, you would have rapidly become very frustrated with the lack of the ability to implement improvements. The same day that I was interviewing, the local news was there reporting on layoff announcements.
Regards,
RE: Lean Manufacturing - Without proper planning