INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Beacon Line Jib Crane

Beacon Line Jib Crane

Beacon Line Jib Crane

(OP)
My client wants to relocate an existing 2-ton Beacon Line Jib crane manufactured by Cleveland Beacon Products.  The client has none of the original information from the crane vendor regarding.  The vendor no longer makes the crane.  I have contacted them for information as to design forces to be used for the foundation design and anchorage of the crane to the foundation.

The crane is 2-ton, has a 22' boom and is 16'7" high.

I know I can use statics and refer to the ASCE 7 for the appropriate load increases, but I was hoping someone might have some old Cleveland Product Literature to share.

Thank you
PAT2

RE: Beacon Line Jib Crane

pat2,

I never heard of Cleveland Beacon jib cranes, but maybe you could research similar products from current manufacturers for technical data.  Personally I would do the calcs myself.

I assume this is a free standing base plate mounted crane that needs to be bolted to a block type foundation.  The most severe load case for overturning is when the load is at the end of the boom when located over one of the foundation corners.  To avoid uplift on the back side of the foundation these blocks can get very big and heavy.  The allowable soil capacites are involved in these calculations which may be more or less than assumed in manufacturers designs.

Designs for overturning should include weight of boom, hoist, lifted load, and impact.  Impact is a function of hoist speed and is usually about 15% but I'm not sure about that.  The monorail and CMAA specs have that info.

If you are not comfortable with these calculations, or if you want to bolt this crane to an existing concrete floor, you should consider getting a consultant.  

Regards,
-Mike

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources