INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rock Bolt Design

Rock Bolt Design

Rock Bolt Design

(OP)
Considering a project where there will be a 55' deep excavation.  The top 13' is fill material (125 pcf) that can be laid back at a 1.5:1 slope.  The lower 42' will be a vertical face cut by blasting the rock and excavating in lifts.  The general shape of the excavation is square.  Recovery on the rock is 85% to 100% and RQD ranges from 37% to 80%.  Water table is about 7' below grade.

k=k(a)=0.33
k=k(o)=0.5

A crane will sit at the top of the excavation, so a 250 PSF surcharge should be assumed.

What is the best method to determine the spacing of rock bolts/anchors for this situation?

Thanks.

RE: Rock Bolt Design

Totally depends on the structural geology and rock type.  In may situations, bolting may not be required.

What type of rock is it and what type of structural geology?

Frank Lucca M.I.Exp.E.
www.terradinamica.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources