Bridge Replacement
Bridge Replacement
(OP)
Does anybody have any idea about the time required for removing a steel bridge (of 10-15m long U-frame) carrying ballasted track?
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Bridge Replacement
It would depend a lot on working conditions, location, etc.