INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

tunnel lining

tunnel lining

tunnel lining

(OP)
I am designing the final lining for construction under a lake.  In operation the tunnel will be full of water.  My controlling case will be during the construction period the lining will support the hydrostatic load.  The head has been determined from the flood level of the lake.  The liner should be unreinforced concrete and the tunnel is in rock.
To this point I have used the .55 strength reduction factor (ACI318 9.3.5) and I applied a 1.6 load factor to the hydrostatic pressure.  The load factor is 1.6 rather than 1.4 because there is not a control of the flood level. The construction period is over 1 year.

Am I being to conservative?

RE: tunnel lining

I am not at all experienced in the design of tunnel liners, so please keep that in mind as you read my post.

Using a strength reduction factor of 0.55 and a load factor of 1.6 equates to a factor of safety of 2.9, which is high for temporary works.

An approach that is used in cofferdam design is to set a design flood elevation and only allow work in the cofferdam when the water surface is below this elevation.  If it goes higher, vents (cut-outs) are used to flood the temporary works automatically so as not to fail the cofferdam.

You could design for a 2-year, 5-year, or 10-year storm and cleary note this on the plans.  If the water level exceeded this level, the tunnel might have to be flooded until the water level receded.

With this approach you should be able to use the lower load factor as the unknowns would already fe factored into the design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources