INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rectification of Boxculvert & Wingwall Connection Joint

Rectification of Boxculvert & Wingwall Connection Joint

Rectification of Boxculvert & Wingwall Connection Joint

(OP)
Hello Everyone,

We need to rectify the connection bet. the boxculvert and wingwall expansion joint because vertical cracks exists due to settlement on the wingwall and wrong orientation of joint connection Inlet side. Our plan is to correct the expansion joint and break the vertical crack portion from the top of wingwall to the upper jt. foundation and concrete it from bottom to top.  

Problem is we should have an effective Stream diversion before we concrete water is about 1.5m deep, any help on how to plan a stream diversion that is economical for only rectifying that joint?

RE: Rectification of Boxculvert & Wingwall Connection Joint

Sandbags and plastic sheets or jersey barrier, plastic and sand.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources