INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Post Weld Heat Treating ASME B31.3 Help

Post Weld Heat Treating ASME B31.3 Help

Post Weld Heat Treating ASME B31.3 Help

(OP)
My company  has provided two vessels that required PWHT. Unfortunatly the vessel manufacturer only stress relieved for 15 minutes and it appears that it should have been done for a minimum of 1 hour.  The vessels have already placed in service on hydrocarbon gas.

Can the existing vessels be stress relieved after cleaning or is it necessary/easier to replace the vessels?

Thanks

RE: Post Weld Heat Treating ASME B31.3 Help

Per ASME Section VIII, Div. 1 Table UCS-56, 15 minutes is the minimum permitted based on thickness of 1/4-inch or less.  How thick was the vessel shell. And yes, the vessels can be re-heat treated for the appropriate duration. One wonders why the Inspector did not catch this.

Please note that B31.3 is not applicable to pressure vessels.

RE: Post Weld Heat Treating ASME B31.3 Help

(OP)
Thank you for your quick reply.  I'm not sure what the total thickness of the material is as it is not noted on the drawing I have.  

I do know that the vessels were to be rated to 200 psig with .125 corosion allowence. The material is carbon steel of some type, made from plate, rolled and welded.  I find your comment regarding pressure vessels interesting.

Inspection is catching it now. Installation occured a year ago for one, and 6 months for another.  As for our QA, it may have been that the requirement was not passed along through purchasing.  PWHT was performed by an outside vendor who did so to a code they may have selected.  Everything probably appeared correct to our QA. We'll figure out where the fault lies later so we can prevent furture mistakes.

We obviously have some additional research to do.  I'll let you know how it turns out.

Thanks again

kaf

RE: Post Weld Heat Treating ASME B31.3 Help

Steam...

Are these stamped ASME Code Pressure Vessels ? Section VIII ?

Is there a U-1 data report to which you can refer ?

MJC

  

RE: Post Weld Heat Treating ASME B31.3 Help

(OP)
Actuall yes  The vessel was stress relieved to ASME Section VIII, Div. 1 Table UCS-56.  There is also a U-1 data report.  I don't have the copies in front of me at this location, but called to confirm the U-1 report was included.  Is there some information you are curious about?

The application is draining liquids from a fuel gas compressor line.  We are using nitrogen as a motive gas to "pump" the liquid away since P2 is greater than P1.  The unit functions as a blowcase pump.

RE: Post Weld Heat Treating ASME B31.3 Help

befor any things that is important to know Pno. of the material then according to ASME sec VIII Div.1 table UCS-56
we can take suitable result.

RE: Post Weld Heat Treating ASME B31.3 Help

Steam
If the material is carbon steel there fore the Pno. is 1 and you can attention to table UCS-56 from ASME sec VIII Div.1 and solve your problems.

RE: Post Weld Heat Treating ASME B31.3 Help

(OP)
Yes

Material is carbon steel.  From here and other sources, referenced spec should have been  ASME Section VIII, Div. 1 Table UCS-56.  I am discussing with the client tomorrow.  

Thanks for the help

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources