INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Design of a pump around system

Design of a pump around system

Design of a pump around system

(OP)
Question: I work on an enviromental remediation project where we need to remove a section of a sewer line due to contamination. What we need to do, is order the correct rated pump to handle the flow rate of liquids that would normally pass through this line from the upgadient areas. There are several upgradient lines that connect to this one and the load is from runoff water only. Is there a nice rule of thumb for something like this or do you need to do some Q=VA calcs. I dont do this sort of thing much. Thanks for any help you can offer.

RE: Design of a pump around system

The fastest way is to compile all your system parameters (flow, SG, head change, pipe size, etc) and contact pump vendors. They can tell you what pump you need along with what driver power is required.

"If A equals success, then the formula is: A = X + Y + Z, X is work. Y is play. Z is keep your mouth shut."
-- by Albert Einstein

RE: Design of a pump around system

Will this be a temporary rental pump, which will pump water until the pipe is replaced, or a permanent lift station?

Either way the pump will probably need to be sized for max expected flow, which it will rarely see.  If original design data is not available for the line flow, then a quick conservative estimate may be to go by the line size.( I would guess that there are tables somewhere for capacity of sewer lines of x size at y slope running half full.  Some of the civil guys who work with gravity flow may know where to find.)

If temporary, you might be able to get away with a self priming pump which would periodically lose and regain suction during a rain.(depending on job duration)  A diesel drive would allow some flow adjustment to better suit current conditions.

If permanent or long term, you may need a sump which would start the pump(s) at high level and shut off at low level.  Several companies offer these in pre-packaged assemblies.





Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.