INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

form removal

form removal

form removal

(OP)
Hi, Would you please inform me about the form removal times of slabs? What must be the compressive strength of concrete (in terms of percentage of design strength) to begin form removal. Thank you in advance

RE: form removal

For slabs on grade, removing the side forms within a few hours (in warm weather) is usually not unreasonable. For elevated slabs there are, of course, other considerations. In any event, with or without the forms, the concrete needs to be protected from damage and allowed time to cure properly. Here is a short article with more detailed recommendations
http://www.concreteconstruction.net/pclinic/pc_template.asp?ProbClinicID=C720317

www.SlideRuleEra.net

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources