INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Design of Telecommunication poles using PLS-POLE

Design of Telecommunication poles using PLS-POLE

Design of Telecommunication poles using PLS-POLE

(OP)
Hello, I'm new to the forums, my question is if anyone uses PLS-Pole as a program method to design telecomunication poles.

I have been using a spread sheet that links to SAPS, now with the revision G to the TIA/EIA 222 code we are moving towards the PLS-POLE direction. If anyone has any imput on this I will greatly appreciated.

Thanks,
Marcello

RE: Design of Telecommunication poles using PLS-POLE

I have used the program, and liked it but the developers are more geared towards the Powerline Industry which makes things difficult for modeling telecommunication towers.  I think the program is around $2500 for the pole version and if you want towers its another $3500.  If you work with the telecommunication industry then you would need both.  After using PLS-POLE & TOWER for several years I tried another program called ERI Tower.  This software is tailored  for telecommunications a lot better than Powerline.  They have a fully functional demo & a well documented manual.  Hope this helps.

http://www.c-conceptsinc.com/index.html

RE: Design of Telecommunication poles using PLS-POLE

I use the PLS software daily to do transmission lines and use PLS-POLE ocassionally to analyze telecom poles for EIA loads (we put PCS antennas on our transmission towers) and sometimes use stand alone poles on our property.  I also talk or email the developers weekly about program improvements and they work on the EIA issues quite a lot with PLS-POLE, so I sort of disagree with STR04 that they are geared more toward powerline industry to the detriment of the EIA.  They do put significant development to EIA issues.  From my meager experience with EIA, the big issue is with the automatic generation of the loads on the structure.  Most structural software can easily handle the analysis of the structure, the challenge is to get the loads correct.

I am also a GTStrudl user and they have a Telecom Tower module they are starting to market as an add on to the general software.  The module is for latice masts either guyed or free standing.

_____________________________________
I have been called "A storehouse of worthless information" many times.

RE: Design of Telecommunication poles using PLS-POLE

(OP)
Thanks for all the info. I like where transmissiontowers is coming from. The trick to use PLS-POLE is to know how exactly put in the loads or tell the loads to the program.

Since you do a lot with the program anc communicate with the PowerLine company, do you think they will issue a manual on how to analize or design telecomunication poles in PLS-POLE. I have seen the current manual and it is sort of general, hardly to get any info on EIA loads.

I would like to keep this forum open so any replies will be very helpful.

Thank you

Marcello Posada
Project Engineer
PennSummit Tubular

RE: Design of Telecommunication poles using PLS-POLE

Marcello;
Take a look at this paper by Dan Horn:
http://www.c-conceptsinc.com/files/Technical%20Manual%201.pdf  which deals with base plate design.

Also, get the latest PLS-POLE manual from their web site thru the Help menu and take a look at the various Tech Notes on their web site (use the site search feature).  I would read the latest EIA code and then re-read the pole manual to familiarize myself with how they analyze the tubular poles and how they implement the EIA loadings.  If you are designing tubular poles, take a look at the pole designer function.  Their shaft optomizer uses a brute force method to design 1000's of poles and selects the lightest one.  They also have a base plate designer built in, but it is a compromise from several methods in use around the industry.  It does a good job of determining the bolt loads for the anchor bolts and you can over ride the plate bending length to suit your companies assumptions. (Everyone has their own assumptions about base plate design)

_____________________________________
I have been called "A storehouse of worthless information" many times.

RE: Design of Telecommunication poles using PLS-POLE

I see that the PLS folks have done some work on adding microwave dishes to towers and poles.

http://www.powline.com/newstuff/recent.html#PLS-POLE

_____________________________________
I have been called "A storehouse of worthless information" many times.

RE: Design of Telecommunication poles using PLS-POLE

(OP)
Thanks for all of teh responses. Since last I have obtained the newest version of PLS-SPOLE and have my program running along side with it. I am trying to do designs of monopoles for the telecommunication induxtry using PLS-POLE and have come to a stop on the usage of the new equations on the Revsion G of the TIA manual.

Anyone outthere with a little more knowledge of the manual that can guide me through it.

RE: Design of Telecommunication poles using PLS-POLE

We just ordered the new Rev G (a little over $400) and have not had a chance to digest it yet.  The biggest change is the use of 3 sec gust wind from what I hear.  I've played with Rev G a little in PLS-POLE and from what the programmer tells me the program takes care of all the wind on pole loads for you.  It seems that you would input the antenna area and the linear appurtance area and the program handles the rest.  If you need to verify that PLS-POLE is giving the correct loads, you might do an example problem and wade through Rev G by hand to see if the program gives correct loads.  That's what I plan to do when I get a chance.

_____________________________________
I have been called "A storehouse of worthless information" many times.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources