INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rev control using PDM Works

Rev control using PDM Works

Rev control using PDM Works

(OP)
All,
 I was wondering if anyone had suggestions on this question. The company where I work, in the upper right of the drawing we have a box with 6 fields broken up into 2 rows. The first row would read left to right "Rev", "Realese/ECO #", and "Release/ECO Date". The second row is identical. In the first row we would like to keep the orignal checked in rev with its initial Realease number and date. The second row we would like to populate with the most current rev in PDM.
 We have thought of just having different properties in the part drive the top row in the drawing for its AR release. If we do this then, when we check the part into PDM for release, both rows will read the same. Example: A  AR-XXXX    07-18-05 (1st row)A  AR-XXXX  07-18-05 (second row).
 Essentialy what we want is for a way to have PDM/or SW lock the values in the first row, and put the most current rev info in the second row. Any ideas???

Thanks,
Brad

RE: Rev control using PDM Works

How about making the first row just a note, entered when the drawing is created, with no links to any properties?

SolidWorks 2005 SP01.1
Intel Xeon 2.8GHz 2GB Ram
NVIDIA Quadro FX700 128MB

RE: Rev control using PDM Works

(OP)
If it were made a note and we type in the "Rev" as A, "Release #" as AR-xxxx, and date, we would still need the second row to have fields to be automatically populated by PDM as "rev", "release #" and date. So on intial check in to PDM, we would have to fill in these fields in PDM and it would automatically be filled in on the drawing. Now both rows would be identical.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources