Where can I get reference material on this?
Thanks
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
Transfering load from one side of angle iron to another
|
RE: Transfering load from one side of angle iron to another
In general, the AISC Specification and Manual covers most useful information for steel connections design, which I assume is what you are asking about.
Please send a more specific post.
DBD
RE: Transfering load from one side of angle iron to another
Thankyou for requesting clarification.
I am a ME, not a SE and the material is 6061-T6 aluminum, not steel.
This is for one of several options for a portable structure.
Assume the cross-section of the angle aluminum (2x2x1/4 inches x 4ft. long) is two perpendicular planes. I want to tension load one end in one of the planes and at the other end (4 ft away) balance the load in the other plane of the aluminum angle.
RE: Transfering load from one side of angle iron to another
The behavior to which you are referring (attaching one leg of the angle at one end and the other leg at the other end) is called "shear lag." The formulas used to take account for this action for steel angles (and I assume an alumnimum angle would act similiarly just have different rupture and yield strengths) can be found for both welding and bolting type connections in the AISC steel manual. This effect is taken into account in the "U" factor which is used to modify (reduce) the net sectional area when calculating tension rupture capacity of the section.