INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Metal Working/Forming using punches

Metal Working/Forming using punches

Metal Working/Forming using punches

(OP)
I have a standard rivet (NAS-1198-3-6) with a .045 inch diameter drilled .055 inches deep in the end (leaving a wall thickness of .0245 inches).

I plan on using a formed punch on a pneumatic cylinder to "roll" the wall material outward to form what is essentially a domed end, thus staking the rivet.

Can anyone refer me to a resource that will aid me in determining the force (size of cylinder) required to form the end of the rivet?  I have looked through Roark's and several cases seem to apply, but are innaccurate due to aspect ratios and other assumptions that do not apply to this scenario.  A reference for metal working/metal forming seems to be the direction I need to go, since this will be a plastic deformation.

TIA,
--Scott

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources