INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PDMWorks "Copy Project"

PDMWorks "Copy Project"

PDMWorks "Copy Project"

(OP)
I am trying to “save-as” a top-level assembly containing route subassemblies, but cannot successfully do so.  This is what I’ve done:

1.    In PDMWorks, I copy a project that contains the top assy, route sub-assy’s, & their parts.  All files names contain a common phrase, so I change the filenames using the “replace text” function in PDM.
2.    The original project had also contained some blank .sldprt and .sldasm files, equal to the number of route assy’s & parts in the original assembly.  They, too, are renamed during step 1.
3.    After copying the project, I checked out the new top-level assembly and all children (but did not open).
4.    I opened the original top-level assembly (read-only) and did a “save-as” to the new files, including the route subassemblies and parts through the references dialogue box (using the blank files to get the new filenames).

I had the following problems:

1.    When using “copy project” and “replace text” in PDMWorks, it did not rename the route subassemblies or their children.  They are just links.
2.    Problems maintaining the in-context relationships of the top-level assy & the route files after they were copied.
3.    After picking new files for the route assemblies and their parts in the references dialog box and saving, the new assembly referenced the correct route subassemblies, but was still referencing the old route parts.
4.    PDMWorks said that I owned and had checked out all of the new project’s files.  But the SW references box said that a couple of the route parts were read-only.  They are clearly owned by me in PDMWorks.


I have played with this off and on for the past month or so, tying different ways to make this work.  But something is always off.  If anyone has had similar experiences or just has some suggestions, I would be grateful to hear them.

MimiN

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources