INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Economizer installations

Economizer installations

Economizer installations

(OP)
Would like to hear opinons on what is the most common scenario when installing Boiler Feed Water Economizers:

A: Deaerator-->Eco-->Boiler
B: Degasifier-->Eco-->DA-->Boiler

Thanks in advance.

I_mak

RE: Economizer installations

In the industrial areas that I work in, "A" is by far the most common.

Others may have different experience.

rmw

RE: Economizer installations

(OP)
Thanks Rmw for your reply.

My experience is the same, i.e. more "A" cases rather than "B".

Btw, can you recall what heat recovery was in those cases?
I am doing a utilities system efficiency check where Eco giving 20-23deg.C heat recovery and flue gases leaving the stack stay ~170-190 deg.C. To me heat exchange is too low and stack temp it too high!

That's why I led me to think that in my particular case, scenario "B" would give a better duty.

Thought?

Thanks.

I_mak

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources