INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rockfill placement on bedrock with water

Rockfill placement on bedrock with water

Rockfill placement on bedrock with water

(OP)
Hi all,

I´m looking for helpful tips or comments on the placement of rockfill (-75mm) ontop of clean bedrock, which is quite uneven (+/- 1 m or so). Due to site conditions, water is covering much of the bedrock. Draining the "pond" is not working effectively due to groundwater flow.

The question is: does placing and compacting this rockfill "underwater" in lifts of around 300 mm have negative effects on the properties of the fill compared with if there was no water?

best regards,
Throstur

RE: Rockfill placement on bedrock with water

How deep is the water?  If, say, the water is 2m deep, how are you going to place and "compact" the rock-fill in 300mm lifts?  Best bet is to use, say, 25 to 75 stone, dump it in until you are out of the water, level, chink the surface and then place your normal fill atop.  Indian Road standards permits tipping placement through the water of -75mm gravel and sand (with a uniformity coefficient of not less than 10) without compaction.

RE: Rockfill placement on bedrock with water

(OP)
Thanks for the input. Here are a bit more info to fill in the gap.

The water is not 2m deep. Maximum depth of around 600 mm meaning the compactor can easily operate on the layer in the water with vibration. The material that's being used is fixed and will not be altered, i.e. max size 75mm.

I'm just wondering whether the effect of the compaction is poor when the rockfill layer is completely saturated in water since foundations will be placed ontop in the near future. Do we absolutely need to drain the water before place the fill?

RE: Rockfill placement on bedrock with water

Throstur - okay the water is shallow - the material placed you call rockfill - 75mm max.  What is, say the %passing #4? #200.  If the rockfill is clean - as I indicated above, you won't get much compaction.  In many places they use clear crushed stone for sewer fills to get away from compaction.  How high will the foundations be above the current water level?  Again, I would think that you would be putting in a granular pad to raise the grade to get the area out of the water.  If, say, you are founding "at" current water table, then, the thin layer of stone should not have much settlement problems - how much will <1m of rockfill settle anyway?  So not much worry there.  All in all, I'd drop the fill through the water, get it out of the water by 300 to 500 and then compact the layer with your roller - staying out of the water.  Big rollers will compact more than 200mm anyway.  You'll get some compaction of the lower layers - enough I would think not to worry.

RE: Rockfill placement on bedrock with water

(OP)
The rockfill is blasted and crushed basalt. The gradation has approximately 30% passing the #4 sieve and approx. 2-3% passing the #200 sieve. The foundation will be around 2 m above the bedrock and are settlement sensitive.

The compactors are 15-19 (metric) tons so they actually compact to some depth - that´s true.

Thanks for your comments BigH,

RE: Rockfill placement on bedrock with water

I think that I would do a thicker first lift to get out of water, then as above.  Good Luck!

RE: Rockfill placement on bedrock with water

Throstur:  We recently performed a similiar type operation at the bottom of a canyon cleanout where future fill layers would be approximately 85 feet in thickness.  We have done this on numerous occaissions.  As in your case, the granular nature of the fill (low percentage < 200 sieve) with larger fragments permitted an effective placement of oversized materials (2 to 4 foot boulders) within a rockfill.  Spacing of the oversized was ensured to prevent arching.  We monitored the fill performance for 2 years with settlement monuments and have had excellent results.  The granular nature of the fill is effective in allowing equipment movement under water.  We made sure and spec'd select fill to prevent the fine content from increasing above acceptable levels.

Good luck.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources