INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Meaning of "Redline"

Meaning of "Redline"

Meaning of "Redline"

(OP)
What do people mean when they talk about "redlining" a print?

RE: Meaning of "Redline"

Hi,

Redlining as far as I know has at least 2 meanings.

In terms of equipment the redilining is taking it to the max. Driving it to its maximum permissable tolerance. Simular to driving a car with the revs bordering on the red zone.

As for print, redlining is just that. Highlighting areas for review/correction or deleting by underlining them in red. This used to be on paper but can be on electronic print allowing the author (an in some cases only the author) to correct any errors.

Regards

RE: Meaning of "Redline"

Agree with the 2 terms above. But have a third....

If I have a procedure for an operation and there is any deviance this will be redlined, basically written up in the procedure in red pen and then signed for by both parties ie. those performing the operation and the client.

RE: Meaning of "Redline"

Another definition a little different than Laffalot's second:

In construction, redlining refers to "as-built" marks on a drawing showing how something was actually constructed, indicating where there were deviations from the design drawing.  Usually done by the contractor, and required to be submitted to the Engineer for review and preparation of "official" record (or "as-built") drawings.

RE: Meaning of "Redline"

I agree with Carl the execution group changes (with the approval of designer/project engineer depending upon the extent of change) drawings to suit site conditions, usually these are minor chnages, and marked red lines on that changes. These drawnigs are called redline markup drawings and sent to design department for the preparation of "as built" drawings. Engineering/design department incorporates that redline marked up changes in thier originol design and "As Built" drawings are prepared.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources