INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

High pressure boilers Hot blow

High pressure boilers Hot blow

High pressure boilers Hot blow

(OP)
Hi every body,
My question is that why we hot blow the High pressure Boilers(Drum pressure169 bar and 1000t/h steam generation) and when (As per pressure/boiler condition)
My informations is not much so i m asking experts.
Regards
S.M.Ahsan

RE: High pressure boilers Hot blow

For a boiler of this size 169 Bar (2451 psi) and ~2 million pounds of steam per hour, this sounds more like a large Power Boiler for electric generation?

If so, hot blowdowns are not required if you have feedwater heaters. Typically, for large power boilers, the blowdown is used to control excursions in water chemistry. It is not something that should be done on a continual basis unless you do not have HP or LP feedwater heaters to preheat feedwater. For most small recovery boilers, this is a different matter.

I would strongly suggest you review ASME Section VII, Recommended Guidelines for the Care of Power Boilers. This is a comprehensive source book for operation, care and maintenance of Power Boilers.

RE: High pressure boilers Hot blow

As Meteng states, large high pressure drum boilers used for power generation usually do not need to utilize bottom blowoffs except at part loads to control water chemistry upsets related  to "phosphate hideout".

The original purpose of the bottom blowoff was to eliminate accumulations of crud that developed in low pressure boilers with primitive , non-volatile water chemistry treatments. Also, older boilers had rolled tubes in teh drums, which led to accumulations of metal shavings that needed to be removed ( which would plug up anything except an wye pattern globe valve). The boiler bottom blowoff could also be used to lower  the drum water level in an emergency situation, and for that reason the B31.1 contains specific rules for the design of the blowoff drain piping ; it requires those drains to be super-strong to prevent failure due to high momentum 2-phase flow upsets.

Regardless of size and pressure rating of the boiler, ASME sect I pg 59.3.3 still requires each boiler be supplied with a boiler bottom blowoff connection " in direct connection with the lowest water space available" This means the bottom of a waterwall header or bottom of a dwoncomer.

One large vendor of HRSG's has interpreted the pg 59.3.3 to mean the bottom of the steam drum, but that is clearly an incorrect interpretation and it led to a failure of the blowoff drain pipig at one of our sites. The steam drum bottom drain was not formally defined as the ASME required boiler bottom blowoff connection on contract P+ID's, so its drain to the flash tank was not designed as strong as B31.1 would require for such a connection. When the operator opened the drain to blowdown excess phosphates due to hideout , the darin pipe failed. Fortunately no-one was hurt.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources