Our company has chosen to use three revision levels; Prototype (01-99), Release (A-Z) and Production Release (PA-PZ).
PDMWorks allows Primary, Secondary and Tertiary revision schemes.
I cannot get the three to work. I check-In a document at 01 and cannot get it to revise up to A or PA.
Anyone been there, done that?
Thanks,
PBerg
PDMWorks allows Primary, Secondary and Tertiary revision schemes.
I cannot get the three to work. I check-In a document at 01 and cannot get it to revise up to A or PA.
Anyone been there, done that?
Thanks,
PBerg






RE: PDMWorks
RE: PDMWorks
i.e.
Lifecycle: Prototype Rev:01-99
Lifecycle: Release Rev: A-Z
Lifecycle: Production Rev: PA-PA
thanks for the response,
PBerg
RE: PDMWorks
Chris
Sr. Mechanical Designer, CAD
SolidWorks 05 SP2.0 / PDMWorks 05
ctopher's home site
FAQ371-376
FAQ559-1100
FAQ559-1091
FAQ559-716
RE: PDMWorks
RE: PDMWorks
I realize this is different than what you are asking for. If you cannot use it I would understand. We had a similar revision system as yours before PDMWorks. We do not use lifecycles.
Open the PDMWorks 2005 VaultAdmin, Revision Scheme, Revision information. Under Primary From: and To: leave blank, click radio button “Listing”. In that column on the first line enter A for Prototype.
Next line in same column enter R for Release.
Then in the third line enter P for Production.
The first column would look like this:
A
R
P
No Separator if you wish. The Secondary would be 01 in the From: and 99 in the To: Click the radio button below Secondary to Range.
A dash as Separator between Secondary and Tertiary.
Under Tertiary would be 01 in the From: and 99 in the To: Click the radio button below Secondary to Range.
For Working copy enter a plus “+ “.
Prototype would look this: A01-01, A02-01, A03-01 and etc. The -01 is the minor revision.
Release would look this: R01-01, R02-01, R03-01 and etc. The -01 is the minor revision.
Production would look this: P01-01, P02-01, P03-01 and etc. The -01 is the minor revision.
Bradley