INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Modeling a series of pipes as ponds?

Modeling a series of pipes as ponds?

Modeling a series of pipes as ponds?

(OP)
I have set up an exisiting pipe network system modeling each pipe as a pond (catch basin) with an outlet (culvert). I have an individual subcat contributing to each pond and then the ponds connected in series. The system is currently undersized and my goal is to delay my site's runoff until the existing system has capacity.

My question or problem is that my peak elevations for these catch basins modeled as ponds is anywhere from 40 feet (at the beginning of the network) to 5 feet (at the discharge end of the network) above the actual pipe invert(s). Is this the hydraulic grade line and therefore I can ignore the value or is there a way to "force" all the runoff into these pipes while  maintaining the crown elevations?

RE: Modeling a series of pipes as ponds?

If you are using pipes for underground storage (rather than just conveyance), you should model the system as a pond with the "Detention Pond (or other storage area)" option NOT as a catch basin.  On the STORAGE tab, use the "Horizontal Cylinder" option to describe your pipe storage system.

RE: Modeling a series of pipes as ponds?

These elevations are the HGL at each point in the system.  This is the headwater required to force the existing flow throught the system without any storage.

If the elevation comes above grade, you are probably using above-ground storage (such as a parking lot).  For accurate routing, you must include this storage volume as part of the appropriate pond(s).  Once the storage is defined, this volume is likely to reduce the peak elevations considerably.

The "Horizontal Cylinder" storage option is intended for use with some type of outlet control (such as an orifice plate) at the lower end.  Be cautious about using it with a standard pipe.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources