INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Prism Testing

Prism Testing

Prism Testing

(OP)
Hey all,

I am in a small town that tends to be backwords at times, and most of the structural engineering has been done by civils who have tried hard, but sometimes don't understand the building code as well as they should to practice structural engineering, but that is a different subject for a different post.  My question is about prism testing.  The city reveiwers have told my client that no one requires prism testing (or other method as listed in the UBC) except our firm.  As I understand it (we are using the 1997 UBC in this city), if you design masonry to the full capacity (ie. do not divide the allowables by 2) then special structural inspection is required as well as prism testing.  The city seems to think that since no one else requires prisms when special inspection is required there must be a loophole in the code somewhere.  I contacted the local testing agency engineer, and he says that he doesn't know, he just does what is required by the EOR.  The city says that I get to specify what tests are done as part of the special inspection, but it seems to me that prism testing or other method is required.  Does anyone else know any loophole, or anywhere that it says that the EOR specifies exactly what tests are done as part of the inspection.

akastud

RE: Prism Testing

Prism testing is only one of three ways to verify quality in masonry construction.  

The section 1701.5.7. - Structural Masonry - covers the requirements for special inspection of masonry.  It references the taking of prisms, but doesn't REQUIRE prisms...it only says that the inspector needs to be there to observe the taking of prisms if they are made at all.

UBC 97, section 2107.1.2 says that you simply divide by two if you don't do special inspections.

Now read section 2105.3.  This sets compliance with f'm.

There are three ways to do this.
1.  Prism tests  
2.  Prism test record
3.  Unit strength method

Each of these three have separate provisions for full stress and half stress designs.  Normally, most engineers use unit stresses unless a higher than normal f'm is required.  This doesn't require prisms, just testing of units and grout.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources