INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Post-Tension Cable placement & site preparation

Post-Tension Cable placement & site preparation

Post-Tension Cable placement & site preparation

(OP)
Our Post-tension foundation has cables that range from one  inch in depth in the 4"slab, to over 5 inches.  Some of the cables that are 5 " are not in beams.  One cable was never stressed and ranges from less than 2" to over 5".  The soil is virgin, expansive, and did not have the required 4 inches of sand compacted before moisture barrier and concrete pour.  The moisture barrier was not layered, but rather just butted together, the duct tape came apart according to one core sample.  We have differential settlement in the structure.
Is this unusual in foundation construction, or is this normal construction standard, as the builder's Geotechnical Engineer claims.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources