INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

(OP)
We are currently looking into using a CFA system for a foundation design for a custom home.  If anyone has some experience with such systems what are some good and bad points (e.g., effectiveness of installation, cost, time, etc.).

Thank you very much for any responses.

RE: CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

CFA is a very cost effective deep foundation system.  Construction of this system is much quicker than the other systems.  However, it requires very careful quality control.  The drilling rigs should be equipped with special device to monitor the volume and pressure of the concrete or grout.  It is also not suitable for some types of soil, e.g.; if one of the soil layers is soft clay.  You did not describe the soil profile in your project. You can find helpful information in a TexDOT Report No. 3921-1 by Hassan et al.

RE: CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

kkoloj,
Can you go into more detail about the CFA system.  It sounds similar to augered cast in place deep foundations, which are commonly used through soft clays.

RE: CONTINUOUS FLIGHT AUGER (CFA) SYSTEMS

The local man is about $17 per foot.  Tests with SPT to be sure he is down to good.  8" piles.  Won't do a job with less than about 50 piles or charges a mobilization fee so doesn't do standard houses, just big ones.  Takes 3 days to do large house.

The optimist sees the glass as half full.  The pessimist sees the glass as half empty.  The engineer see the glass as too big.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources