INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

piping up Vertical Oil bulk storage tanks

piping up Vertical Oil bulk storage tanks

piping up Vertical Oil bulk storage tanks

(OP)
I am piping up Vertical Oil bulk storage tanks. These tanks after installation could move due to settlement. The total movement can be up to 4". What do you suggest that I do with the piping to take care of the settlement? The settlement could be span over several years.

RE: piping up Vertical Oil bulk storage tanks

This should not be much of a problem if you follow the guidelines for pipe flexure analysis given in ASME B31.4 code and nozzle calculations in API 650.   It is only an assumption that these are the relevant code for your service and geographical area.  Calculate the nozzle flexibility on the tank and support the pipe as appropriate for your 4” of required settlement.  Spring hangers may be required adjacent to the tank for the required flexibility.  Give some additional information regarding relevant codes, pipe dia, etc, and someone might be able to give you some detailed advice.  

RE: piping up Vertical Oil bulk storage tanks

I did not mean to trivialize the required work in my above post.  It is obvious by your question that you have not done this type of work before.   If you get the relevant codes and, after careful review of the codes, you decide to try to do this work yourself, I strongly recommend you have a experienced piping engineer review your work.

Regards,
CRG

RE: piping up Vertical Oil bulk storage tanks

ampc726,
        Just a reminder not to forget the tank "bulging" effects in your assessment as this can be significant when assessing the actual pipe loads on the tank wall.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources