INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Using UT Testing Results

Using UT Testing Results

Using UT Testing Results

(OP)
Will soon be UT testing boiler feedwater piping.  

The Power Piping Code has an 'A' factor (corrosion/erossion/mechanical strength allowance).  Is this just to be used for a new piping installation calculation or should there be some 'A' amount considered to determine minimal thickness for existing piping?

Weld Joint Efficiency 'E'.  We have seamless pipe but I don't know how it was previously welded at the fittings and in the pipe runs.  What is a good value to use for 'E' in such a case?

With the previous inputs determined would you consider the minimum thickness calculated to be strictly adhered to for pipe that has been in service for quite a while?  That is, would you replace pipe and fittings whose thickness was measured to be below the minimum thickness as calculated from the Power Piping Code or would you allow pipe thicknesses some % below the minimum thickness calculation but no thinner?  Where do you draw the line?

RE: Using UT Testing Results

The assessment of the current status of the inspected pipework is known as "fitness for service".  It is not possible to go into detail in this forum but you may wish to look at the following:

http://www.fitness4service.com/index.htm

API RP 579

BS 7910

I'm not sure that the latter two documents will be strictly applicable to power piping but they will give you the flavour of what needs to be done to "keep the plant running".

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources