INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Soldier Pile Wall - Soil Conditions

Soldier Pile Wall - Soil Conditions

Soldier Pile Wall - Soil Conditions

(OP)
New here. The soil in the area is a firm clay. For modeling the soldier pile wall below the dredge line, can we assume the soil will be cohesive in the long term or must we model the soil as granular for the long term?
I though only Geotechs can help me with this.

RE: Soldier Pile Wall - Soil Conditions

Long term - granular

RE: Soldier Pile Wall - Soil Conditions

(OP)
Thank you. Can you tell me why?

RE: Soldier Pile Wall - Soil Conditions

(OP)
Sorry, I guess I did not frame it right. I understand that we are designing for the drained condition since over a period of say 200 years, undrained condition may not apply. But is it required to design a structure for that long term? Am I making any sense?

RE: Soldier Pile Wall - Soil Conditions

It's pretty common and sometimes specified to design permanent structures for a drained condition where cohesion is assumed to approach zero.  It is usually also more conservative to use c = 0 with a relatvely low phi angle.  Structures may be termed permanent if they are to remain in service for as little as 1.5 or 2 years.

RE: Soldier Pile Wall - Soil Conditions

Although lab testing in clay is always best, typically normally consolidated clays will gain strength with drainge, so the undrained strength will control. Overly consolidated clays generally lose strength with drainage, although that can be a slow process, therefore drained strength will control. Agin this is a generality and should be based on testing or at least some local experience.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.