INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pass Through Forces Steel Connections

Pass Through Forces Steel Connections

Pass Through Forces Steel Connections

(OP)
Re: structural steel
In braced frames the connections should be designed for "pass through forces" shown on the drawing.
I am looking for definition of "pass through forces" and references about this.
Please suggest.
Thanks.

RE: Pass Through Forces Steel Connections

Never heard of it.

RE: Pass Through Forces Steel Connections

Where did you get that phrase?

RE: Pass Through Forces Steel Connections

I am guessing that it is the horizontal component of the force pulling thru the beam-column-beam-connection. It varies depending on how many bays you are away from the braced bay (just a guess).

RE: Pass Through Forces Steel Connections

(OP)
Pass through forces at connections are common in Canada.
It is happening at connections with braces.
We need to show these forces on the drawing for the steel detailers.
It has to do with horizontal forces (wind, seismic).

RE: Pass Through Forces Steel Connections


Horizontal load has to be transfered into a braced frame somewhere.

A line of horizontal load, from a floor system for example, may be transfered back to one braced bay. As the load is transferred from beam to beam, the axial load is transferred though the connection. Usually axial tension is of most concern. The axial tension may increase the connection angles from 5/16 up to 3/8 or 7/16 due to prying action on the angles. Also the bolts need checked.

When I am reviewing shop drawings I always check to make sure the connection loads are fully developed.  These pass thru loads must be included.

Another example of pass thru loads that can easily cause significant effects to the connection design occurs when two bays next to each other require clear spans at different levels. The full horizontal component of the brace load must be passed thru the common column.

William Thornton has done a lot of work on connection design and I recommend reviewing some of his papers available thru the AISC.

Best Regards to All

JPJ
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources