INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Total Ret Pond Assignment...Did I forget anything?

Total Ret Pond Assignment...Did I forget anything?

Total Ret Pond Assignment...Did I forget anything?

(OP)
I am to draw a pond/bank/fence to the dimensions specified, estimate a total cost for the project, and list all the steps ness to design it.  My steps include:

Testing the soil for what sort of (if any) liner it needs.
Testing for what sort of compaction will be needed on the bank (for driving on it)
Testing/calcing for what protection the bank will need from possible erosion
Interior bank protection from waves (rip rap i guess)

Mosquito, and/or rodent control

Safety fence during construction
Warning Sign posted during/after construction
Opperators building equiped with refrigerator (samples?) first aid, life boats/jackets?, parking area, a few lights.

If needed:
Liner type, and anchors/assembly
Erosion blanket and anchors/assembly (or type of grass if that's all it needs)

How high should my chainlink fence be?  Do I need barbed wire?

My bank is 45 degrees, how much of a slope can my ramp have?  (I think I drew it at 30 degrees because that was how much cut I had left over the way i calc'ed it)

He told us not to worry about any of the inlet or outlets, or any of the sewarge calc's (evaporation BOD ect) or rainfall or anything like that.

Thanks,
She

RE: Total Ret Pond Assignment...Did I forget anything?

I only see five question marks here.  So, here you go, in order:

The fridge in the lab is required for the composited samples.  Just large enough to hold the compositing containers, usually just a little one like you had in your college dorm room.

Life boats/jackets would require more OSHA-guidance than engineering.  Check with them.

Chain-link fence should be 8' high.

It should definitely have barbed-wire on top.  And a lock on the gate.

A ramp up a grass bank should be no steeper than 10%, or trucks won't be able to traverse it.

Remember: The Chinese ideogram for “crisis” is comprised of the characters for “danger” and “opportunity.”
-Steve

RE: Total Ret Pond Assignment...Did I forget anything?

(OP)
Thanks Steve!  I'm so glad I came here and asked.
Ronelle

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources