INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Excavation Rate

Excavation Rate

Excavation Rate

(OP)
I need to work out the £ per cubic metre (+10% profit margin) for the following:
EXCAVATOR data:
180 degree output 50cu m/hr  
costs including operator = £600 per/day
Lorries: 10 cubic metre capacity. Cost including driver = £300 per/day
SITE data: 5000 cubic metre excavated. Haul distance is 4kl at average speed of 30km/hr. lorry loading time 12 minutes and tipping time 4 minutes.  Tipping charge £2 per cubic metre.  Bulking factor for material expected to be 25%.

RE: Excavation Rate

So do it. Use the education you have to do the math.

RE: Excavation Rate

6250    m^3    625    lorries
125    hrs.    0.53    hr./lorry
15.625    days    331.25    hrs.
£9,375        £24,922    

Total    £37,727        

Cost     £6.04    per m^3    

RE: Excavation Rate

(OP)
I would like to say thanks to earthguy for responding.

  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources