INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Lot Pads

Lot Pads

Lot Pads

(OP)
Hello!

I'm a civil engineering technician and need to teach myself some of the basics of calulating lot pads.

Can anyone point me in the direction of some resources or a quick tutorial on calculating lot pad elevations from site or lot plans?

Or maybe you can drop a few tips for me in this post.

Thanks a bunch!

RE: Lot Pads

I'm not trying to be UNhelpful in my opening, but sometimes the posts here bewilder me.  If one is in training, why isn't one getting training vs. asking here?

Anyhoo...it would be helpful to know what kind of lot you are speaking of.  Are these residential lots, or is this a 50 acre parcel with a Walmart and supplementary store pads?

In either case, I get my basic criteria from the client.  Often different clients have different desires for some of these things.  In residential, for example, one may like a house finished floor two feet above the street...another 3 feet...and another may want the front yard graded at 2% up from the curb.  Some may want the house to be the same elevation in the back....another may want it dropping to the back.

Once I have that criteria...I start at the roadway on the higher side of the lot and grade up to the house pad at the minimum slope. I then check that it does not exceed maximum slopes tying in elsewhere.  I make sure the surface grades away from the pad. As one sets adjoining pads, one may have to make adjustments.  A bit of tail chasing sometimes.

Hope that helps get you started.

RE: Lot Pads

check your local drainage ordinances, as minimum finished floor elevations are required to be above flood elevations in the street or any nearby floodplain.  Also make sure you have posative drainage away from the building.  This is an important detail, often overlooked.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.