INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Mass Earth Excav in winter condtions

Mass Earth Excav in winter condtions

Mass Earth Excav in winter condtions

(OP)
I'm building a retail store in NY this time of year.  The site is a balanced cut/fill but the existing materials are saturated.  Most soil stabilization methods can not be done because of the weather.  Any suggestions??

RE: Mass Earth Excav in winter condtions

Dig out the cut and pile it up . Put a silt fence around it. Or look for a pit to fill. Import some good material.

RE: Mass Earth Excav in winter condtions

(OP)
The contractor wants to get paid to handle the material twice and the owner does not want to pay for imported material.  

RE: Mass Earth Excav in winter condtions

The owner needs to adjust his expectations to reality.  It is not resonable to assume that winter earthwork will not require more time and money than summer earthwork.

RE: Mass Earth Excav in winter condtions

(OP)
The owner has stated that in the documents the contractor is to carry money for winter conditions (soil stabliization) --Soil stabilzation cannot be used for mass earth excavation-- There was a geotech report for the project but was for information only to the contractor, not to use for bidding purposes.  It did say the material was moist but suitable.  Wouldn't you say that if your saturated beyond a certain point that this would be an unforseen condition?

RE: Mass Earth Excav in winter condtions

Did the contractor know when bidding the project that the work would occur during the winter months?  If yes then he should have expected some additional costs that depending on the contract he should have included.

You make the statement that soil stabilization cannot be used for mass earth work.  Why not?  Was the "...carry money for winter conditions..." a pay item or was it incidental to other work?  

All this together will indicate how this cost should be distributed between the contractor and owner.  However, the reality is if the contract does not feel that he is being treated fairly then at best he will complete the work for no additional money very slowly.  At worst he will test how NY treats the "... contractor not to rely on provided geotechnical information..." statement in the contract.

RE: Mass Earth Excav in winter condtions

If the contract documents clearly required the contractor to perform all moisture conditioning,i.e., drying, to acheive the proper compaction, the contract schedule has not been changed by the owner to put the work schedule into a different season, and sufficient geotechnical data was included with the documents that demonstrated the on-site soil conditions, then the contractor is probably on the hook to perform the work, whatever it takes....unless the contractor can prove that this season was "unusually" severe and could have a claim under "act of God".  I've been through this one many times.  If you have an understanding owner and a competent contractor, it might not get too nasty.  Good luck.

RE: Mass Earth Excav in winter condtions

(OP)
The Contractor has stated you cannot stablize soils to this large of an area. There is an actual fill area for a DOT roadway if 15 feet.  The entire parking area of the building is a cut/fill situation.  The suggested stablization methods are: fly ash (town will not allow),  lime (too cold), geotext fabrics, or bridge lifts.  Could you even use these methods with soils that optimum moisture is 8% and we have 17%?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.